Moveable Shielding Concept Design Study
UK FUSION ENERGY LTD
- Frist
- 11 Tage · 17. Sept. 2026
- Auftragswert
- 70.000 €
- Leistung
- — · CPV 71300000
- Region
- UK
- Quelle
- EU-Oberschwelle (TED)
- Veröffentlicht
- 24. Aug. 2026
- Bekanntmachung
- Original ansehen ↗
Leistungsgegenstand
UKFE is seeking to appoint a supplier to provide a Concept Design Study for a Moveable Shielding requirement, as part of the STEP Prototype Power Plant. UKFE is leading the delivery of the STEP programme to design and build the UK’s first prototype fusion energy plant at West Burton, Nottinghamshire. Please see the Tender Pack, available on the UKFE Delta Portal, for further details on this requirement, the rules of the procurement, and how to bid. For more information about this opportunity, please visit the eSourcing portal at: https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Engineering-services./2VD655382C To respond to this opportunity, please click here: https://ukfe.delta-esourcing.com/respond/2VD655382C
KI-Angebotsentwurf
Reperta schreibt einen strukturierten Entwurf für genau diese Ausschreibung — geerdet auf Ihr Firmenprofil.
Der KI-Angebotsentwurf ist für angemeldete Nutzer. Anmelden — in 30 Sekunden, ohne Passwort.
Ähnliche offene Vergaben
- Evaluation des Sofortprogramms CybersicherheitBundesministerium für Gesundheit17.734.454 €
- Sanierung Hallenbad Burghausen - GerüstarbeitenStadt Burghausen
- Wegeinstandsetzungen in den Forstbetriebsbezirken (FBB) Schanze (Los 1) und Glindfeld (Los 2) des Regionalforstamtes Oberes SauerlandWald und Holz NRW
- Wegeinstandsetzung im Forstbetriebsbezirk (FBB) Hardtburg des Regionalforstamtes Hocheifel-Zülpicher BördeWald und Holz NRW