Ausschreibungen / Bauleistungen
Design and Installation of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site
Cyson Cymru
- Frist
- 29 Tage · 14. Aug. 2026
- Auftragswert
- 2.700.000 €
- Leistung
- Bauleistungen · CPV 45000000
- Region
- UKL21
- Quelle
- EU-Oberschwelle (TED)
- Veröffentlicht
- 17. Juli 2026
- Bekanntmachung
- Original ansehen ↗
Leistungsgegenstand
Cyson Cymru, on behalf of Newport City Council (NCC), is seeking Engineering, Procurement and Construction (EPC) proposals for the turnkey design, installation, and commissioning of the solar farm and a DC coupled battery with a 400V grid connection at the Newport City Council’s recycling centre depot in Newport, to form a fully compliant and working installation. It is anticipated that the EPC contract will be awarded in 2026, and the design and construction will be undertaken in 2026/7. The Contractor will be responsible for the supply, installation, and maintenance of a solar photovoltaic and battery system (the ‘Works’) up to 1.1MWp in gross PV capacity with a 2MWh DC battery energy storage system (BESS) on the land shown in Appendix 19.3 of the Specification, and located at grid reference ST306857.
KI-Angebotsentwurf
Reperta schreibt einen strukturierten Entwurf für genau diese Ausschreibung — geerdet auf Ihr Firmenprofil.
Der KI-Angebotsentwurf ist für angemeldete Nutzer. Anmelden — in 30 Sekunden, ohne Passwort.
Ähnliche offene Vergaben
- Blendschutz UHG 1BAUniversität Bielefeld
- Lieferung und Montage Vertiv Knürr DCD Cooling DoorRheinische Friedrich-Wilhelms-Universität Bonn
- Neubau eines Wohnheims für Menschen mit mehrfachen Behinderungen (WfmB) für das Caritas Wohnheim Friedrich Lorenz - Los 313 Maler- und LackierarbeitenCaritas Sozialverbund gGmbH
- Bau Kreativforum, Cleantech Innovation Park, HallstadtCleantech Innovation Park GmbH